Case files · Marine survey

Hydrographic & bathymetric case studies

Sixteen port, harbour and intake/outfall surveys across Oman — multibeam and dual-frequency bathymetry, side-scan sonar, sub-bottom profiling, ADCP currents and benthic studies, reduced to Chart Datum and reported against IHO S-44 to the order specified for each survey. Delivered by our team through Nusail Engineering Consultancy for Ramboll, Atkins, DAMAC, Worley Parsons, OPWP and MISC & Veolia.

Case file / multibeam

Quay walls surveyed while ports stayed open.

M3 multibeam quay wall survey chart, Port of Salalah16.9416° N · 54.0034° E — PORT OF SALALAH
CASE FILE / MULTIBEAM QUAY WALL

Port of Salalah — quay wall bathymetric survey

ClientRamboll
ScopeUnderwater quay wall multibeam survey
EquipmentM3 multibeam sonar · TSS DMS 3-05 motion sensor · AML SV probe & profiler · Valeport TideMaster
SoftwareHypack & Hysweep
PositioningLeica RTK + Hemisphere DGPS heading · local UTM

Oman's largest port required an underwater quay wall condition survey. The M3 multibeam was pole-mounted with the GNSS antenna in the same vertical plane as the transducer for direct horizontal positioning; motion, sound-velocity and tide corrections were applied in real time, with daily CTD dips and bar checks.

CASE FILE / QUAY WALL + DIVE SUPPORT

Port Sultan Qaboos, Muscat — berths 1–10

ClientDAMAC — Port Sultan Qaboos Development Project
ScopeHydrographic quay wall survey, berths 1–10
EquipmentM3 multibeam · TSS DMS 3-05 · AML SV probe & profiler · Valeport TideMaster
DeliverableSeabed layout, quay wall condition & foundation assessment

A 114-hectare waterfront regeneration at Muttrah required quantitative assessment of seabed layout, quay wall condition and foundations at ten berths ahead of a 700,000–800,000 m² GFA development. Multibeam coverage was paired with dive inspection data.

Multibeam quay wall survey, Port Sultan Qaboos, Muscat23.6250° N · 58.5667° E — PSQ, MUTTRAH
Khasab Port bathymetric and side-scan survey chart, Musandam26.1908° N · 56.2477° E — KHASAB, MUSANDAM
CASE FILE / GEOPHYSICAL + ADCP

Khasab Port redevelopment — full marine site investigation

ClientAtkins
ScopeBathymetric · side-scan · seismic · current measurement
EquipmentOdom Hydrotrac · EdgeTech 4125-P · GeoPulse pinger · RDI Teledyne ADCP · Sokkia RTK · Valeport tide gauge
ResultSedimentary seabed characterised · 1:1000 chart · 30-day campaign

Bathymetry, side-scan sonar, shallow seismic sub-bottom profiling and a four-station ADCP programme recording at 2-minute intervals through 2–13 m depths — covering the redevelopment area and the optional Khor Qada site. Sound velocity verified at 1520 m/s; 1:1000 chart delivered; wrecks and outfalls mapped as construction hazards.

CASE FILE / IHO S-44 ORDER 1A

Duqm SEZ — intake & outfall marine survey

StandardIHO S-44 Order 1a (as specified) · 1:2500 reporting · Admiralty Chart Datum
Metocean4 × ADCP full lunar cycle · 2 wave/current buoys, one month
Sampling50 water & sediment stations · 20 SSC samples · 15 probe profiles
Equipment2 × Odom Echotrac MKIII · EdgeTech 4125-P · GeoPulse · Midas CTD+ · Van Veen grab · Niskin sampler

Shore-approach characterisation for seawater intake and outfall structures north of Duqm Port: 15 × 15 m grid bathymetry (±0.1 m depth, ±0.5 m position), three 160 m high-resolution corridors, geophysics, a full lunar cycle of ADCP at −12 m CD, two wave & current buoys, and 50 water/sediment stations sampled in summer and winter.

Duqm SEZ bathymetric survey chart of the shore approach19.6600° N · 57.7000° E — DUQM SEZ
Sohar Port seawater intake bathymetric chart24.3700° N · 56.6300° E — SOHAR PORT
CASE FILE / SETTLEMENT MONITORING

Sohar Port — seawater intake settlement monitoring

ClientMajis Industrial Services (MISC) & Veolia
Accuracy±50 mm GPS-verified
EquipmentOdom Echotrac MKIII · Sokkia RTK · Hemisphere DGPS · Valeport tide gauge
DatumUTM 40Q · WGS84 · Chart Datum

Repeat bathymetric profiles monitored settlement at the MISC & Veolia RO plant seawater intake. Dual-frequency 210/33 kHz soundings positioned to ±50 mm with RTK GNSS, reduced to Chart Datum on UTM Zone 40Q, and charted at 1:1000 for comparison between epochs.

CASE FILE / NATIONAL PROGRAMME

Six fishery harbours — Musandam to Dhofar

ClientWorley Parsons
SitesMahout · Al-Shuwaimiya · Sadah · Rakhyute · Dibba · Kumzar
MethodOdom HT100 200 kHz · 20 m fixes · HydroPro · tide-reduced depths
Vessel32 ft survey vessel · pre-mobilisation safety audits · journey management

Worley Parsons commissioned bathymetry, benchmark establishment and 1 m-contour topographic mapping at six fishery harbour sites spanning the whole Oman coast — Mahout, Al-Shuwaimiya, Sadah, Rakhyute, Dibba and Kumzar — so each harbour design was neither under- nor over-engineered. All six sites were completed within the client's time limit with zero safety incidents.

Survey vessel mobilised for the six fishery harbours programmeOMAN COAST — SIX HARBOUR SITES

Further case files

Ten more ports, harbours and IWP sites.

Benthic species chart from the Al Ghubrah IWP seabed survey
Environmental

Al Ghubrah IWP, Muscat

4 km² bathymetry at 20 m spacing plus ROV benthic transects for the desalination intake/outfall — new octocoral, octopus and nudibranch records reported.

MUSCAT · OPWP (SAOC)
Environmental

Quriyat IWP

Bathymetry for dredging quantities plus benthic transects T1–T4 in 3–40 m depths; soft sand and gravel substrata confirmed, no seagrass or coral.

QURIYAT · OPWP (SAOC)
Seeb Harbour bathymetric survey chart
Bathymetric

Seeb Harbour

10 m line spacing, 0.5 m contours at 1:1000; DWG and ASCII XYZ deliverables. Completed 02–09 January 2012.

MUSCAT · MIN. OF AGRICULTURE & FISHERIES
Masira Port pre-dredging bathymetric chart
Pre-dredging

Masira Port

210/33 kHz profiles at 20 m intervals; 1:2500 chart flagged an exposed rock sand bar at low tide in the dredging area.

AL-WUSTA · MARINE TECHNOLOGY
Bar Al Jissah bathymetric chart
Pre-dredging

Bar Al Jissah

Seabed profiling along the dredging area on UTM 40Q / WGS84, vertical control on Chart Datum; 1:2500 chart.

MUSCAT · MARINE TECHNOLOGY
Quriyat Harbour bathymetric chart
Dredging analysis

Quriyat Harbour

Fishing harbour profiles reduced to LAT from a breakwater tide gauge; dredging quantities computed against design depth.

QURIYAT · MARINE TECHNOLOGY
Dibba fishing harbour bathymetric chart
Dredging analysis

Dibba Fishing Harbour

Pre-dredging profile charted at 1:750 with tidal reduction to LAT. Surveyed April 2012 for MOAF.

MUSANDAM · MOAF
Gamdah and Al Jari bathymetric and topographic chart
Bathy + Topo

Gamdah & Al Jari

100 ha bathymetry on a 20 m grid plus 50 ha topographic survey; 0.25 m contours at 1:1500, DWG and XYZ deliverables.

MUSANDAM · HMR
The Wave Muscat bathymetric chart
Bathymetric

The Wave, Muscat

Offshore bathymetry for the waterfront development at 5 m minimum line spacing with 0.25 m contour mapping.

MUSCAT · THE WAVE MUSCAT
Surveyor observing coastal control with a total station
Field QA/QC

Control & calibration

Every campaign ties to client or NSA benchmarks, with daily bar checks, CTD dips and journey-managed vessel operations.

ALL SITES · GIS MAPPERS
Aligned to IHO S-44 (order as specified)UTM 40Q · WGS84Chart Datum / LAT reductionDaily bar checks & CTD dips

Datum, accuracy and verification method are stated on each deliverable.

Marine survey enquiry

Planning a port, dredging or intake survey?

Send us your survey area and required standard — we respond with methodology, equipment spread and a fixed quotation.